Hammersmith Technical Institute Section A - Details of Engine Room and Boiler House
Date
13 Sep 1905
Creator(s)
Code
UAL/4/1/1/3/11
Catalogue link
A plan of the engine room and boiler house of the technical institute, including details of drainage and the boiler house doors.